MAIN SHOWCASE · INTAKE / CLASSIFICATION / PROVENANCE

AiR pipeline architecture

The gatekeeper: what enters, what passes, and what can move onward.

Turn incoming specifications into organized, traceable records that can feed the portfolio.

Map dense, nested builds and their lineage rather than treating each filename as one finished product.

Local review record. Not a release or a claim of completed integration.

Explore the architecture

ARK PRIME is a playful interactive layout demonstration, not evidence of a running pipeline. All content is simulated; no live data is connected.

Open ARK PRIME demo ↗

The intended path

  1. 01

    Intake and document extraction

  2. 02

    Registry identity and duplicate reconciliation

  3. 03

    Grade the current master and preserve older material

  4. 04

    Route records through publication checks

What the record supports

OBSERVED

The Architect supplied intake/master-grading requirements and a branching CP0–CP9 governance diagram. The local portfolio reproduces that blueprint with accessible route explanations; this does not certify live execution.

ARCHITECTURE

Intake and classification lead to CP2 adjudication. Promotion goes to CP4 and custody; remediation loops, hold stays held, and reclamation uses CP3. Trusted egress follows CP6–CP9. These branches are architecture, not measured runtime.

UNVERIFIED

Full semantic training, representative test coverage, production OCR routing, cross-system handoffs and end-to-end publication safeguards.

NEXT CHECK

Run representative long documents, scans, duplicates and changed masters through the real chain; retain receipts at each stage.

Source basis: Architect’s AiR requirements, 5–10 November 2026, and supplied CP0–CP9 flowchart inspected 13 November 2026. No live data or service endpoints included.

The governance blueprint

The supplied CP0–CP9 design branches at adjudication. Promotion does not pass through the reclamation gate.

Explore the exact blueprint and branch routes →